Fill Dirt Calculation Formula:
From: | To: |
Fill dirt is earthy material used to create a solid, stable foundation for construction projects or to change the elevation of land. It typically consists of subsoil that's free of organic matter, which prevents settling and decomposition over time.
The calculator uses the standard formula for calculating cubic yards:
Where:
Explanation: This formula calculates the volume in cubic yards, which is the standard measurement for bulk materials like fill dirt.
Details: Accurate calculation of fill dirt requirements is essential for budgeting, minimizing waste, ensuring proper compaction, and achieving the desired elevation and slope for your project.
Tips: Measure the length, width, and desired depth of the area in feet. For irregularly shaped areas, break them down into rectangular sections and calculate each separately. Always add 10-15% extra to account for compaction and settling.
Q1: What's the difference between fill dirt and topsoil?
A: Fill dirt is subsoil with little organic matter, used for structural purposes. Topsoil contains organic matter and nutrients, used for gardening and landscaping.
Q2: How much does a cubic yard of fill dirt weigh?
A: Typically between 2,000-3,000 pounds, depending on moisture content and composition.
Q3: Should I compact the fill dirt?
A: Yes, proper compaction is essential to prevent settling. Compact in 6-8 inch layers for best results.
Q4: How do I calculate for irregularly shaped areas?
A: Divide the area into smaller rectangles, calculate each separately, then sum the results.
Q5: How much extra should I order?
A: It's recommended to order 10-15% more than your calculated amount to account for compaction, settling, and measurement errors.